There is a huge light switch (2m wide 4m high) somewhere in each building that requires 4-5 strong people to bring it up once it gets turned off.
That’s what I think of when I hear that big ‘thump’ sound and feel the small vibration of the building as the lights come back after a power outage,
No comments
Comments feed for this article
Trackback link: https://mika.im/nikki/teiden/trackback/